Usulan Kebijakan Perawatan Dan Biaya Pada Mesin 1110 Jc Dengan Menggunakan Metode Reliabilty Centered Maintenance (rcm) Dan Cost Of Unreliability (cour) (studi Kasus: Pt. Xyz)

Authors

  • Lalu Galeh Inggil Fatristya Telkom University
  • Fransiskus Tatas Dwi Atmaji Telkom University
  • Endang Budiasih Telkom University

Abstract

ABSTRAK
PT XYZ merupakan salah satu perusahaan industri pupuk yang ada di Indonesia yang terletak di daerah Karawang, Jawa Barat. Aktivitas produksi pada perusahaan berlangsung selama 24 jam. Untuk mengetahui kebijakan maintenance dan biaya yang dikeluarkan oleh perusahaan pada mesin 1110 JC maka digunakan metode Realibity Centered Maintenance (RCM) dan Cost of Unreliability (COUR). Dengan metode Realibity Centered Maintenance (RCM) dapat diketahui kebijakan maintenance yang optimal seperti penjadwalan maintenance dan biaya perawatan mesin. Metode lain yaitu Cost of unreliability (COUR) untuk mengidentifikasi biaya kerugian yang dikeluarkan oleh perusahaan atas kerusakan komponen pada mesin 1110 JC. Berdasarkan hasil perhitungan dan pengukuran dengan menggunakan metode RCM diperoleh kebijakan maintenance untuk komponen pada mesin 1110 JC adalah scheduled oncondition task sebanyak 9 yang terdapat pada komponen Stator sebanyak 4, Rotor sebanyak 3 dan Gear Couling sebanyak 2. Kemudian untuk Scheduled discard task sebanyak 2 yang terdapat komponen Mechanical Seal. Interval waktu perawatan didapatkan berbeda-beda berdasarkan task masing-masing. Biaya perawtan usulan diperoleh Rp.37.399.066.865 dimana biaya tersebut lebih kecil dari biaya perawatan existing. Kemudian metode COUR biaya yang disebabkan berdasarkan corrective time Rp.17.716.712.514 dan Rp.29.439.880.650 berdasarkan downtime.
Kata Kunci – Preventive Maintenance, Realibity Centered Maintenance, Cost of unreliability
ABSTRACK
PT XYZ is one of fertilizer industry companies in Indonesia located in Karawang, West Java. The company production activity lasts for 24 hours. To identify maintenance and cost policy expended by company on Machine 1110 JC, Reliability Centered Maintenance (RCM) method and Cost of unreliability (COUR) are used. Centered Maintenance (RCM) method can identify the optimum maintenance policy like maintenance scheduling and cost of machine maintenance. Other method, namely; Cost of unreliability (COUR) is used to identify the loss cost expended by company for the damaged component on the machine 1110 JC. Based on the calculation and measurement by using RCM method, it is found that the maintenance policy for the component on machine 1110 JC is 9 times scheduled on condition; 2 times on stator, 3 times on Rotor, and 2 times on Gear Coupling. Then, the machine also requires 2 times maintenance on Scheduled discard task located on Mechanical Seal component. The maintenance interval time is identified different based on each task. The maintenance cost proposed is Rp.37.399.066.865 in which it is less than the existing maintenance cost. Then the COUR cost is Rp.17.716.712.514 in corrective time-based and Rp.29.439.880.650 in downtimebased.
Keywords – Preventive Maintenance, Realibity Centered Maintenance, Cost of unreliability