Feasibility Study On Igg Network Development In The Sangatta & Mangkajang Branching Unit Using Mp?s

Authors

DOI:

https://doi.org/10.34818/eoe.v7i3.14159

Abstract

Abstract. The province of East Kalimantan has good market potential, due to the relocation of Indonesia’s capital city to East Kalimantan. Based on the results of population projections, it is estimated that in 2040 the population in East Kalimantan will reach 189.917.791 inhabitants. Unfortunately, there is only one landing station that connects East Kalimantan with the internet network, the Balikpapan landing station. This study conducted an analysis of the placement of landing station based on potential internet users, geographical conditions, network feasibility based on the value of Bit Error Rate (BER), Quality Factor (Q-Factor), Power Received, and business feasibility by the Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PBP). The technical simulation result showed BER value 3,94E-32, Q-Factor 11,7147, and power received -18,8614 dBm. Besides, for Capital Budgeting simulation results show that it takes 4 years 3 months for the PBP, NPV > 0 and, IRR of 31 %. Keywords: Submarine Cable Network, Net Present Value, Internal Rate of Return, Payback Period, Indonesia Global Gateway (IGG).

Downloads

Download data is not yet available.

References

1.APJII, “Penetrasi & Profil Perilaku Pengguna Internet Indonesia,” Apjii, 2018.

2.PT. Telkom Indonesia Tbk., “Peta Transport Backbone PT.Telekom Indonesia,” p. 114.

3.Databoks, “Jumlah Penduduk DKI Jakarta,” 2017. [Online]. Available: https://databoks.katadata.co.id/datapublish/2018/01/24/berapa-jumlah-penduduk-jakarta. [Accessed: 13-Jun-2020].

4.G. Keiser, “Basic Concepts of Communication Systems,” in Optical Communications Essentials, 2004.

5.Tribun Kalitim, “Kebakaran Hutan Menyebabkan Kabel Telkomsel Terbakar,” 2015. [Online]. Available: https://kaltim.tribunnews.com/2015/11/05/kebakaran-hutan-menyebabkan-kabel-telkomsel-terbakar. [Accessed: 14-Jun-2020].

6.Badan Nasional Penanggulangan Bencana, “Rekapitulasi Luas Kebakaran Hutan,” 2019.

7.PT. Telkom Indonesia Tbk., “Annual Report Telkom Indonesia 2018,” 2018.

8.Telecommunication Standardization Sector ITU, “Optical System Design and Engineering Considerations,” Tech. Recomm. G, vol. 39, 2016.

9.PT. Telkom Indonesia Tbk., “Indonesia Global Gateway Cable System Supply Contract Section 3,” 2016.

10.N. R. Fachrurrozi, “Analisa Kelayakan Capital Budgeting Jaringan Backbone Kabel Serat Optik Palapa Ring Studi Kasus : Palapa Ring Barat,” J. Telekomunikasi. dan Komputer., vol. 9, no. 2, p. 87, 2019.

11.K. Ardalan, “Payback Period and NPV : Their Different Cash Flows,” J. Econ. Finance. Educ., vol. 11, no. 2, pp. 10–16, 2012.

12.M. Klinkowski and M. Marciniak, “QoS guarantees in IP optical networks using MPLS/MPLambdaS,” Int. Conf. Transparent Opt. Networks, vol. 2001-Janua, pp. 321–324, 2001.

13.G. Y. Cho and J. M. Chung, “Analysis of MPLS vs. MPLambdaS Next-Generation Networking Technologies,” Conf. Rec. Asilomar Conf. Signals, Syst. Comput., vol. 1, pp. 518–522, 2001.

14.Badan Pusat Statistik, Pedoman Penghitungan Proyeksi Penduduk dan Angkatan Kerja. 2010.

15.CNBC, “Presiden Putuskan Ibu Kota RI Pindah ke Kalimantan Timur,” CNBC, 2019. [Online]. Available: https://www.cnbcindonesia.com/news/20190826121608-4-94621/%0Asah-jokowi-putuskan-ibu-kota-ri-pindah-ke-kaltim. [Accessed: 19-Nov-2019].

16.BAKOSURTANAL, “Atlas Sumber Daya Kelautan,” 1998.

17.Otoritas Jasa Keuangan, “Data SBDK Juli 2018 - February 2020,” 2020.

18.H. Jauhari, “Kampiun Pekerjaan Pra-Konstruksi Pembangunan Sistem Komunikasi Kabel Laut (SKKL),” 2015.

19.S. Prianggono, Tugas Akhir “Performance Analysis of Optical Distribution Network (ODN) NGP-PON2 Using Time and Wavelength Division Multiplexing (TWDM) Technology,” Telkom University, 2017.

Downloads

Published

2020-12-01

Issue

Pages

9396-9405

Section

Program Studi S2 Magister Elektro

How to Cite

Karel, B. K. M. A., Sugesti, E. S., & Hanuranto, A. T. (2020). Feasibility Study On Igg Network Development In The Sangatta & Mangkajang Branching Unit Using Mp?s. EProceedings of Engineering, 7(3), 9396-9405. https://doi.org/10.34818/eoe.v7i3.14159