Abstract—Currently on the island of Nusa Penida only electricity is supplied from the diesel electric power plant Kutampi. The plan is that in 2022 there will be an additional source of electricity that comes from PV solar energy. In addition to the two power plants already mentioned, this study will examine the option of adding wind power plant. The characteristics of renewable energy generators are intermittent and non-dispatchable, so a BESS (battery energy storage system) is also used as power smoothing and frequency control. The planning for the optimal hybrid power plant in Nusa Penida aims to increase the contribution of renewable energy and reduce the COE (Cost of Electricity) lower than the existing COE of Diesel Power Plant in 2018, that is 19 cent$/kWh. As well as testing the stability of the system frequency with the allowable range according to the Java, Madura, and Bali Grid Code, which ranges from 49.0 Hz – 51.0 Hz. Keywords—Nusa Penida, diesel electric power plant, PV solar energy, wind power plant, BESS, hybrid power plant, renewable energy, optimal

References

[1] M. F. Fikri, R. A. A. R, and C. Hudaya, “Study on Optimization of Renewable Energy-Based Power Plants on The Electricity System of Nusa Penida Island, Bali,” Sent. 2018 Semin. Nas. Tek. Elektro 2018, pp. 265–275, 2018.

[2] Bali Province, Bali Governor Regulation Number 45/2019 Concerning Bali Clean Energy. 2019, p. 20.

[3] Republic of Indonesia, Presidential Decree No. 22/2017 Concerning The General National Energy Plan. 2017.

[4] Nurmela, S. Sasmono, N. Hariyanto, D. Hamdani, and K. M. Banjarnahor, “Optimal and Reliable Variable Renewable Energy Power Plant for Isolated Area,” pp. 1–4, 2021.

[5] Kunaifi, “HOMER Program for Feasibility Study of Hybrid Power Plants in Riau Province,” Semin. Nas. Inform., vol. 1, 2010.

[6] K. UGM, “Press Release – DIgSILENT Software Training,” 2018. https://kmteti.ft.ugm.ac.id/press-release-pelatihan-software-digsilent/ (accessed Sep. 04, 2021).

[7] Ministry of Energy and Mineral Resources, Regulation of The Minister of Energy and Mineral Resources Number 20 of 2020 Concerning The Grid Code of The Java, Madura, and Bali, no. 3. 2020, pp. 417–607.