DESINING PROJECT SCHEDULE FOR MIGRATION PROJECT STO DAGO IN PT. XYZ TO ACCELERATE PROJECT DURATION USING SCHEDULE COMPRESSION A LESSON LEARN CASE STUDY FOR ANOTHER SIMILAR PROJECT

Authors

  • Ayu Regita Cahyani Soleman Telkom University
  • Devi Pratami Telkom University
  • Achmad Fuad Bay Telkom University

Abstract

A project requires a mature planning, execution, and control. All requirements aforementioned for the project implementation are strongly supported by the availability of materials and labor. Inaccuracies in Project Schedule Management will lead to problems such as delays, soaring costs, etc. Projects that have delay indications should be addressed immediately by accelerating the schedule using the Schedule Compression. The delay indication could be seen during the Monitor and Control Project Work through the Earned Value Analysis (EVM). The aim of using schedule compression in this study is to accelerate the duration of Migration Project in STO DAGO which is one of the long-term projects of PT. XYZ. Migration project is the process of transitioning the telecommunication infrastructure from copper transmission media to fiber optic cable. The contract of Migration Project in STO Dago has been running since January 2014 but it has been terminated on February 2018 when the project has not accomplished yet. The result of schedule compression will suggest a Project Manager to specify some options that can be done to finish the STO DAGO migration project on time, where these options could be used as a preventive action so that other migration project will not experience the same thing as delay and terminated project.

Downloads

Issue

Section

Articles