eProceedings of Engineering Vol 4 No 2 (2017): Agustus, 2017 - Program Studi S1 Teknik Industri
Optimasi Kebijakan Maintenance Dan Pengelolaan Spare Part Pada Mesin Caulking Line 6 Dengan Menggunakan Metode Reliability Centered Maintenance (rcm) Dan Reliability Centered Spares (rcs) (studi Kasus : Pt Dns) AbstrakPDF (English)
eProceedings of Engineering Vol 5 No 1 (2018): April 2018 - Program Studi S1 Teknik Industri
Optimasi Interval Inspeksi, Estimasi Remaining Life, Dan Total Maintenance Crew Pada Mesin Caulking Line Produksi Ke-6 Menggunakan Metode Risk Based Inspection (Rbi) Dan Life Cycle Cost (Lcc) Pada Pt Dns AbstrakPDF (English)
eProceedings of Engineering Vol 5 No 2 (2018): Agustus 2018 - Program Studi S1 Teknik Industri
Analisis Performansi Mesin Menggunakan Metode Reliability, Availability, Maintainability (ram) Analysis Dan Penentuan Umur Mesin Serta Maintenance Set Crew Optimal Menggunakan Life Cycle Cost (lcc) Analysis Pada Mesin Dumping Line 1 Di Pt Xyz AbstrakPDF (English)
eProceedings of Engineering Vol 5 No 2 (2018): Agustus 2018 - Program Studi S1 Teknik Industri
Perancangan Kebijakan Perawatan Mesin Cutting Pada Pabrik Pipa Dengan Menggunakan Reliability, Availability, Maintainability (ram) Analysis Dan Metode Reliability Centered Maintenance (rcm) (studi Kasus: Pt Xyz) AbstrakPDF (English)
eProceedings of Engineering Vol 5 No 2 (2018): Agustus 2018 - Program Studi S1 Teknik Industri
Usulan Jadwal Maintenance Mesin Untuk Mengurangi Opportunity Lost Akibat Terjadinya Unreliability Pada Mesin Weaving Shuttle Dengan Menggunakan Metode Risk Based Maintenance (rbm) Dan Cost Of Unreliability (cour) AbstrakPDF (English)
eProceedings of Engineering Vol 5 No 3 (2018): Desember 2018 - Program Studi S1 Teknik Industri
Usulan Pengelolaan Spare Part Dan Kebijakan Maintenance Pada Subsistem Kritis Reelstand Dengan Menggunakan Metode Reliability Centered Spares (rcs) Dan Reliability Centered Maintenance (rcm) Di Pt Pikiran Rakyat AbstrakPDF (English)
eProceedings of Engineering Vol 6 No 2 (2019): Agustus 2019 - Program Studi S1 Teknik Industri
Usulan Penerapan Total Productive Maintenance (tpm) Untuk Meningkatkan Efektivitas Mesin Single Needle, Single Needle, Chain Stitch, Dan Zig Zag Menggunakan Metode Overall Equipment Effectiveness (OEE) Dan Overall Equipment Cost Loss (OECL) Di Pt. XYZ AbstrakPDF (English)
eProceedings of Engineering Vol 10 No 2 (2023): April 2023 - Program Studi S1 Teknik Industri
Analisis Estimasi Kebutuhan Suku Cadang Mesin Wolf 2 Dengan Menggunakan Metode Reliability Centered Spares, Min-Max Stock, dan Analisis ABC Pada Section Packaging di PT Universal Robina Corporation (URC) Plant 2 AbstrakPDF (English)
eProceedings of Engineering Vol 5 No 2 (2018): Agustus 2018 - Program Studi S1 Teknik Industri
Perancangan Kebijakan Optimasi Sistem Perawatan Pada Mesin Dibn (double Indian Ballbreaker Net Sorter) Dengan Menggunakan Metode Life Cycle Cost (lcc) Dan Overall Equipment Effectiveness (oee) Di Pt.perkebunan Nusantara Viii Perkebunan Ciater AbstrakPDF (English)